Completed Airport Projects
COMPLETED TALLADEGA AIRPORT PROJECTS SINCE 2000
- FY 2017 - TWY A3 and FUEL FARM TAXIWAY REHABILITATION / REMARKING
- FY 2016 - ALP UPDATE (Fifteen Updated Drawings for Planned Growth at the Airport)
- FY 2015 – NORTH TAXIWAY CONNECTOR (At Northeast Corner of Cargo Apron)
- FY 2014 – TAXIWAY SEALCOAT / REMARKING PROJECT / EMER. ACCESS RD. TO APRON
- FY 2013 – CARGO / TRANSIENT APRON (PHASE 3)
- FY 2013 – RUNWAY SEALCOAT / REMARKING PROJECT
- FY 2012 – CARGO / TRANSIENT APRON (PHASE 2)
- FY 2011 – INSTRUMENT LANDING SYSTEM FOR RUNWAY 3 APPROACH
- FY 2011 – WATER TANK REHABILITATION
- FY 2011 – CARGO / TRANSIENT APRON (PHASE 1)
- FY 2010 – TERMINAL APRON REHABILITATION PROJECT; and CONNECTOR TAXIWAY SEALCOAT AND MARKINGS
- FY 2009 – NEW CORPORATE HANGAR; and BRICK ENTRANCE WALL
- FY 2009 – TERMINAL AREA Security Fencing Project; and NEW PAPI Installation project
- FY 2008 – WILDLIFE (PERIMETER) FENCING; “SMS” PLAN (Safety Study); RUNWAY SAFETY AREA CLEARING AND GRADING (East Side of Airport); EMERGENCY GENERATOR FOR AIRFIELD LIGHTING AND NAVAIDS; and AIRPORT LAYOUT PLAN DRAWING (ALD) UPDATE
- FY 2007 – T-HANGAR DEVELOPMENT PROJECT (7-Bay Hangar, Aprons & Twys.)
- FY 2007 – PARALLEL TAXIWAY RELOCATION (PHASE 4) (Center Section)
- FY 2006 PARALLEL TAXIWAY RELOCATION (PHASE 3) AND RUNWAY SHIFT (South End); and SEALCOATING OF RUNWAY AND NEW PAVE,EMT MARKING
- FY 2005 – PARALLEL TAXIWAY RELOCATION (PHASE 2) (South End)
- FY 2004 – PARALLEL TAXIWAY RELOCATION (PHASE 1) (North End)
- FY 2003 – INSTRUMENT LANDING SYSTEM (FAA’s Original Earmark)
- FY 2003 – NORTH RUNWAY SAFETY AREA IMPROVEMENTS; WETLAND MITIGATIONS; ENVIRONMENTAL ASSESSMENT FOR PARALLEL TAXIWAY RELOCATION; and NEW RUNWAY EDGE LIGHTING SYSTEM
- FY 2002 – AUTOMATED WEATHER OBSERVATION SYSTEM (AWOS – III); SOUTH END RUNWAY SAFETY AREA; WILDLIFE (PERIMETER) FENCING (EAST SIDE OF AIRFIELD); and NEW ACCESS ROAD TO SEWAGE TREATMENT PLANT
- FY 2001 – RUNWAY GROOVING, NEW ROTATING BEACON; and NEW RUNWAY END IDENTIFIER LIGHTS (REILs)
- FY 2000 – RUNWAY SAFETY AREA IMPROVEMENTS; and RUNWAY AND TAXIWAY OVERLAY WITH NEW MARKINGS