COMPLETED TALLADEGA AIRPORT PROJECTS SINCE 2000


  • FY 2017   -       TWY A3 and FUEL FARM TAXIWAY REHABILITATION / REMARKING
  • FY 2016   -       ALP UPDATE (Fifteen Updated Drawings for Planned Growth at the Airport)
  • FY 2015          NORTH TAXIWAY CONNECTOR (At Northeast Corner of Cargo Apron)
  • FY 2014          TAXIWAY SEALCOAT / REMARKING PROJECT / EMER. ACCESS RD. TO APRON
  • FY 2013          CARGO / TRANSIENT APRON (PHASE 3)
  • FY 2013          RUNWAY SEALCOAT / REMARKING PROJECT
  • FY 2012          CARGO / TRANSIENT APRON (PHASE 2) 
  • FY 2011          INSTRUMENT LANDING SYSTEM FOR RUNWAY 3 APPROACH
  • FY 2011          WATER TANK REHABILITATION
  • FY 2011          CARGO / TRANSIENT APRON (PHASE 1)   
  • FY 2010          TERMINAL APRON REHABILITATION PROJECT; and CONNECTOR TAXIWAY SEALCOAT AND MARKINGS
  • FY 2009          NEW CORPORATE HANGAR; and BRICK ENTRANCE WALL
  • FY 2009          TERMINAL AREA Security Fencing Project; and NEW PAPI Installation project
  • FY 2008          WILDLIFE (PERIMETER) FENCING;   “SMS” PLAN (Safety Study); RUNWAY SAFETY AREA CLEARING AND GRADING (East Side of Airport); EMERGENCY GENERATOR FOR AIRFIELD LIGHTING AND NAVAIDS; and AIRPORT LAYOUT PLAN DRAWING (ALD) UPDATE
  • FY 2007          T-HANGAR DEVELOPMENT PROJECT (7-Bay Hangar, Aprons & Twys.) 
  • FY 2007          PARALLEL TAXIWAY RELOCATION (PHASE 4) (Center Section)
  • FY 2006         PARALLEL TAXIWAY RELOCATION (PHASE 3) AND RUNWAY SHIFT (South End);  and SEALCOATING OF RUNWAY AND NEW PAVE,EMT MARKING 
  • FY 2005          PARALLEL TAXIWAY RELOCATION (PHASE 2) (South End) 
  • FY 2004          PARALLEL TAXIWAY RELOCATION (PHASE 1) (North End) 
  • FY 2003          INSTRUMENT LANDING SYSTEM (FAA’s Original Earmark) 
  • FY 2003        NORTH RUNWAY SAFETY AREA IMPROVEMENTS; WETLAND MITIGATIONS; ENVIRONMENTAL ASSESSMENT FOR PARALLEL TAXIWAY RELOCATION; and NEW RUNWAY EDGE LIGHTING SYSTEM 
  • FY 2002   –     AUTOMATED WEATHER OBSERVATION SYSTEM (AWOS – III); SOUTH END RUNWAY SAFETY AREA; WILDLIFE (PERIMETER) FENCING (EAST SIDE OF AIRFIELD); and NEW ACCESS ROAD TO SEWAGE TREATMENT PLANT
  • FY 2001   –     RUNWAY GROOVING, NEW ROTATING BEACON; and NEW RUNWAY END IDENTIFIER LIGHTS (REILs)
  • FY 2000   –     RUNWAY SAFETY AREA IMPROVEMENTS; and RUNWAY AND TAXIWAY OVERLAY WITH NEW MARKINGS

 

 